Adarsh Lakefront Phase 2 Construction Specifications, Bellandur
Adarsh Lakefront Phase 2 is a completed group housing project by Adarsh Builders Pvt Ltd in Bellandur, Off ORR, Bengaluru.
Homes cost ₹2.83 Cr at ₹21,067 per sq ft (Mansio price records).
Configurations: 2 BHK, 3 BHK, 3.5 BHK and 4.5 BHK; RERA PRM/KA/RERA/1251/446/PR/200323/003382.
Through Mansio, you save ₹4.66 L on a ₹2.83 Cr home in Adarsh Lakefront Phase 2, after our fee.
Key facts
| Fact | Value | Source |
|---|---|---|
| Developer | Adarsh Builders Pvt Ltd | Mansio developer records |
| Location | Bellandur, Off ORR, Bengaluru (Bengaluru East taluk) | Mansio location records |
| Type | Group Housing | RERA registration |
| RERA number | PRM/KA/RERA/1251/446/PR/200323/003382 | Karnataka RERA, approved Mar 2020 |
| Stage | Ready to Move | RERA registration |
| Possession | Completed | RERA registration |
| Price range | ₹2.83 Cr | Mansio price records |
| Price per sq ft (super built-up) | ₹21,067 | Mansio price records |
| Configurations | 2 BHK (1,341 sq ft), 3 BHK (1,915 sq ft), 3.5 BHK (1,935 to 2,315 sq ft), 4.5 BHK (2,824 sq ft) | Floor plans on file |
| Towers and units | 3 towers, 513 units | RERA registration |
| Land area | 7.53 acres (74% open area) | RERA registration |
| Density | 68.08 units per acre | Mansio, from RERA land and unit counts |
| Approach road width | 14 m | Mansio project records |
| Home loan banks | SBI, Hdfc and ICICI Bank | Mansio project records |
| Construction start | Mar 2020 | RERA registration |
Construction specifications
- Bathrooms: Other Bathrooms: Good quality ceramic tiles dado for all toilets. White colour EWC & washbasin with granite counter top and mirror in all toilets except powder room. Glass shower cubicle in all toilets except powder room & staff's toilet. Single lever shower mixer in all (developer specification).
- Doors: Balcony French Doors: UPVC sliding doors with 3-tracks (one with mosquito mesh) for living room to balcony & bedroom to balcony doors; Internal Doors: All doors with full jamb engineered door frames and shutters except staff’s toilet door; Main Door: Digital door lock for the main door (developer specification).
- Electrical: Power Points: Electrical, TV and telephone points in living and all bedrooms; Power Supply: 2BHK, 3BHK, & 4BHK apartments will be provided with power supply of 5KW, 6KW & 8KW respectively; Switches: Good quality electrical wires and switches (developer specification).
- Flooring: Balcony: Ceramic tiles in balconies and utility area; Foyer Corridor: Granite flooring in ground floor lift lobbies and vitrified tiles in all other floor lift lobbies; Kitchen: Good quality vitrified tile flooring in kitchen; Living Dining: Good quality vitrified tiles in living and dining areas of all flats; Other Bedrooms: Engineered wooden flooring and skirting in all the bedrooms; Utility: Ceramic tiles in balconies and utility area (developer specification).
- Kitchen: Countertop: Kitchen platform (quartz/equivalent material) with stainless steel sink with drain board (unfixed); Kitchen Dado: 2 feet dado above platform area (quartz/equivalent material) (developer specification).
- Plumbing: Drainage: Good quality PVC drainage & storm water pipes; Water Supply: Good quality CP fittings (developer specification).
- Painting: Internal Walls: All internal walls smoothly finished with plastering in all flats (developer specification).
- Security: Access Control: Access controlled entry and exit; Surveillance: CCTV surveillance for the identified common areas (developer specification).
- Structure: Internal Walls: Masonry - walls with 8"/6"/4" block masonry; Structural System: Seismic Zone II complaint - RCC framed structure (developer specification).
- Telecom: Provisions: Fiber-to-the-Home (Data & Voice) (developer specification).
- Windows: Window System: UPVC sliding windows with 3-tracks (one with mosquito mesh) (developer specification).
Questions buyers ask about Adarsh Lakefront Phase 2
What is the structure of Adarsh Lakefront Phase 2?
Internal Walls: Masonry - walls with 8"/6"/4" block masonry; Structural System: Seismic Zone II complaint - RCC framed structure (developer specification).
What flooring does Adarsh Lakefront Phase 2 use?
Balcony: Ceramic tiles in balconies and utility area; Foyer Corridor: Granite flooring in ground floor lift lobbies and vitrified tiles in all other floor lift lobbies; Kitchen: Good quality vitrified tile flooring in kitchen; Living Dining: Good quality vitrified tiles in living and dining areas of all flats; Other Bedrooms: Engineered wooden flooring and skirting in all the bedrooms; Utility: Ceramic tiles in balconies and utility area (developer specification).
What doors does Adarsh Lakefront Phase 2 use?
Balcony French Doors: UPVC sliding doors with 3-tracks (one with mosquito mesh) for living room to balcony & bedroom to balcony doors; Internal Doors: All doors with full jamb engineered door frames and shutters except staff’s toilet door; Main Door: Digital door lock for the main door (developer specification).