Assetz Mizumi Reserve Tower A1 A2 A4 Construction Specifications, Kudlu
Assetz Mizumi Reserve Tower A1 A2 A4 is an apartment project by Assetz Property Group in Kudlu, Off Haralur Road, Bengaluru.
Homes cost ₹2.35 Cr at ₹12,369 per sq ft (Mansio price records).
possession Dec 2030; RERA PRM/KA/RERA/1251/310/PR/040226/008450.
Through Mansio, you save ₹3.70 L on a ₹2.35 Cr home in Assetz Mizumi Reserve Tower A1 A2 A4, after our fee.
Key facts
| Fact | Value | Source |
|---|---|---|
| Developer | Assetz Property Group | Mansio developer records |
| Location | Kudlu, Off Haralur Road, Bengaluru (Bengaluru South taluk) | Mansio location records |
| Type | Apartment | RERA registration |
| RERA number | PRM/KA/RERA/1251/310/PR/040226/008450 | Karnataka RERA, approved Feb 2026 |
| Stage | Under Construction | RERA registration |
| Possession | Dec 2030 | RERA filing (proposed completion) |
| Price range | ₹2.35 Cr | Mansio price records |
| Price per sq ft (super built-up) | ₹12,369 | Mansio price records |
| Towers and units | 10 towers, 440 units | RERA registration |
| Land area | 9.55 acres (87% open area) | RERA registration |
| Density | 46.06 units per acre | Mansio, from RERA land and unit counts |
| Approach road width | 14 m | Mansio project records |
| Clubhouse size | 63,000 sq ft | Mansio project records |
| Water source | BWSSB | Mansio project records |
| Home loan banks | Hdfc | Mansio project records |
| Construction start | Jan 2026 | RERA registration |
Construction specifications
- Bathrooms: Master Bathroom: Kohler & Jaquar or equivalent water efficient CP & Sanitary fixtures. Kohler / Jaquar Shower Head and Faucet. Wooden finish PVC panels false ceiling; Solar Water Heating: Provision for solar heated water in one toilet of top two floor apartments (developer specification).
- DG Power: Apartment Backup: 50% of EB load for inside the apartments; Common Area Backup: 100% backup for common area lighting, lifts, and utilities (developer specification).
- Doors: Balcony French Doors: 3-track UPVC (wooden-finish laminated profile) windows and sliding door with mosquito mesh; Internal Doors: Engineered wooden doors with laminate finish. Wooden Finish Door; Main Door: Engineered wooden doors with veneer finish. Wooden Finish Main Door (developer specification).
- Eco: Waste Management: Segregation at source. Organic waste converter. Zero waste to landfill; Water Management: Water Treatment Plant. Sewage Treatment Plant. Dual piping system. Dual flush system for sanitary. Recycled water used for landscape maintenance. Rainwater harvesting. Ground water recharge (developer specification).
- Electrical: Energy: Energy efficient lights in common areas. Energy efficient streetlights / timer adjusted streetlights. EV fast charging stations provided in designated areas. Power Generated from Solar Panels; Power Supply: EB Power: Studio Unit- 2KW, 2 BHK- 4KW, 3BHK- 5KW, 4BHK- 6KW (developer specification).
- Flooring: Balcony: Vitrified/Ceramic tiles. Stone Finish Balcony Flooring; Bathrooms: Vitrified/Ceramic tiles. Stone-Finish Flooring; Kitchen: Vitrified tiles; Living Dining: Vitrified tiles. Stone Finish Living, Dining and Kitchen Flooring. Threshold - Polished Black Granite; Master Bedroom: Laminated wooden flooring (developer specification).
- Hand Railing: Balcony Railing: RCC parapet with MS top rail/ MS Railings with enamel paint finish (developer specification).
- Kitchen: Countertop: Quartz Counter Top (developer specification).
- Lifts: Lift System: 3BHK Tower - 3 no. passengers lifts and 1 no. service Lift per core of reputed make. 4BHK Tower - 2 no. passengers lifts and 1 no. service Lift per core of reputed make (developer specification).
- Painting: External Walls: Combination of cladding and texture finish with exterior grade emulsion; Internal Walls: Acrylic emulsion (developer specification).
- Security: Surveillance: CCTV coverage on all main entry and exit points (developer specification).
- Structure: Structural System: Seismic resistant RCC structure using system formwork with concrete walls in main building & RCC framed structure up to Ground floor, Clubhouse and other amenities with block work and plastering (developer specification).
- Windows: Window System: 3-track UPVC (wooden-finish laminated profile) windows and sliding door with mosquito mesh. Bathrooms: Powder-coated aluminium ventilators with architrave profile – fixed/openable with provision for exhaust fan (developer specification).
Questions buyers ask about Assetz Mizumi Reserve Tower A1 A2 A4
What is the structure of Assetz Mizumi Reserve Tower A1 A2 A4?
Structural System: Seismic resistant RCC structure using system formwork with concrete walls in main building & RCC framed structure up to Ground floor, Clubhouse and other amenities with block work and plastering (developer specification).
What flooring does Assetz Mizumi Reserve Tower A1 A2 A4 use?
Balcony: Vitrified/Ceramic tiles. Stone Finish Balcony Flooring; Bathrooms: Vitrified/Ceramic tiles. Stone-Finish Flooring; Kitchen: Vitrified tiles; Living Dining: Vitrified tiles. Stone Finish Living, Dining and Kitchen Flooring. Threshold - Polished Black Granite; Master Bedroom: Laminated wooden flooring (developer specification).
What doors does Assetz Mizumi Reserve Tower A1 A2 A4 use?
Balcony French Doors: 3-track UPVC (wooden-finish laminated profile) windows and sliding door with mosquito mesh; Internal Doors: Engineered wooden doors with laminate finish. Wooden Finish Door; Main Door: Engineered wooden doors with veneer finish. Wooden Finish Main Door (developer specification).
What lifts does Assetz Mizumi Reserve Tower A1 A2 A4 have?
Lift System: 3BHK Tower - 3 no. passengers lifts and 1 no. service Lift per core of reputed make. 4BHK Tower - 2 no. passengers lifts and 1 no. service Lift per core of reputed make (developer specification).
Does Assetz Mizumi Reserve Tower A1 A2 A4 have power backup?
Apartment Backup: 50% of EB load for inside the apartments; Common Area Backup: 100% backup for common area lighting, lifts, and utilities (developer specification).