JRC Wild Woods Phase 2 Construction Specifications, Off Sarjapur Road
JRC Wild Woods Phase 2 is an apartment project by JRC Projects in Off Sarjapur Road, Bengaluru.
Homes cost ₹2.83 Cr at ₹12,500 per sq ft (Mansio price records).
Configurations: 3 BHK; possession Mar 2028; RERA PRM/KA/RERA/1251/308/PR/240723/006087.
Through Mansio, you save ₹4.67 L on a ₹2.83 Cr home in JRC Wild Woods Phase 2, after our fee.
Key facts
| Fact | Value | Source |
|---|---|---|
| Developer | JRC Projects | Mansio developer records |
| Location | Off Sarjapur Road, Bengaluru (Anekal taluk) | Mansio location records |
| Type | Apartment | RERA registration |
| Phase | Phase 2 | RERA registration |
| RERA number | PRM/KA/RERA/1251/308/PR/240723/006087 | Karnataka RERA, approved Jul 2023 |
| Stage | Under Construction | RERA registration |
| Possession | Mar 2028 | RERA filing (proposed completion) |
| Price range | ₹2.83 Cr | Mansio price records |
| Price per sq ft (super built-up) | ₹12,500 | Mansio price records |
| Configurations | 3 BHK (2,100 to 2,498 sq ft) | Floor plans on file |
| Towers and units | 2 towers, 403 units | RERA registration |
| Land area | 12.08 acres (77% open area) | RERA registration |
| Density | 33.37 units per acre | Mansio, from RERA land and unit counts |
| Approach road width | 9 m | Mansio project records |
| Water source | Panchayath | Mansio project records |
| Home loan banks | Axis Bank, Bob, Hdfc, ICICI Bank, Punjab National Bank, Canara Bank, Tata Capital and SBI | Mansio project records |
| Construction start | Jun 2023 | RERA registration |
Construction specifications
- Sanitary and CP Fittings: Bathroom Ceiling: Bathrooms will have grid false ceiling; Bathroom Vanity: All Bedrooms Toilets- Granite top with Under Counter Wash-Basin with Hot and Cold-Water Mixture; Cp Fittings: Grohe/Toto/Villeroy and Boch for CP fittings; Other Fittings: Health Faucet and Flush valve in all Toilets; Sanitary Fixtures: EWC and Wash-Basins Made from Villeroy and Boch / Grohe / Toto / American Standard Coloured Vitreous Ceramic Ware (developer specification).
- DG Power Backup: Apartment Backup: 3 BHK is 2 Kw. 2 BHK is 1.5 Kw; Common Area Backup: Common areas 100% (developer specification).
- Doors: Internal Doors: Internal Doors: Laminated Flush Shutters with Dorset Hardware fittings; Main Door: Main Door: Teak Wood Frame with Flush Shutters with Dorset Hardware Fittings (developer specification).
- Common Areas: Energy: ENERGY CONSERVATION: Energy efficient lights in common areas. Timer adjusted street lights; Waste Management: SOLID WASTE MANAGEMENT: Segregation at source; Water Management: WATER CONSERVATION: Dual piping system and dual flush system for Sanitary. All landscape maintained through recycled water. Rainwater harvesting (developer specification).
- Electrical: Switches: Modular switches of Schneider / Legrand (developer specification).
- Flooring: Balcony: Balcony: Anti-skid wooden textured ceramic tiles; Bathrooms: Bathroom: Anti-Skid Ceramic Tiles. Bathroom: Designer ceramic tiles till ceiling; Living Dining: Foyer/Living/Dining/Kitchen: Vitrified tiles; Other Bedrooms: Bedrooms: Wooden flooring; Utility: Utility: Anti-skid ceramic tiles (developer specification).
- Lifts: Lift System: ELEVATOR: Schindler/Johnson/Kone (developer specification).
- Painting: External Walls: Apex Asian Paints for Exterior Walls; Internal Walls: Premium Emulsion Asian Paints on Internal Walls (developer specification).
- External Security: Access Control: Intercom Facility to Guard-House. Video door phone system; Surveillance: 24 Hour Manned Ground Security CCTV at Strategic Points for Surveillance Visitor Management (developer specification).
- Structure: External Walls: External walls of 6" thickness; Internal Walls: internal walls of 4" thickness; Structural System: Basement + Ground + 4 floors RCC Structure (developer specification).
- Windows: Ventilators: UPVC ventilators; Window System: UPVC windows with mosquito mesh (developer specification).
Questions buyers ask about JRC Wild Woods Phase 2
What is the structure of JRC Wild Woods Phase 2?
External Walls: External walls of 6" thickness; Internal Walls: internal walls of 4" thickness; Structural System: Basement + Ground + 4 floors RCC Structure (developer specification).
What flooring does JRC Wild Woods Phase 2 use?
Balcony: Balcony: Anti-skid wooden textured ceramic tiles; Bathrooms: Bathroom: Anti-Skid Ceramic Tiles. Bathroom: Designer ceramic tiles till ceiling; Living Dining: Foyer/Living/Dining/Kitchen: Vitrified tiles; Other Bedrooms: Bedrooms: Wooden flooring; Utility: Utility: Anti-skid ceramic tiles (developer specification).
What doors does JRC Wild Woods Phase 2 use?
Internal Doors: Internal Doors: Laminated Flush Shutters with Dorset Hardware fittings; Main Door: Main Door: Teak Wood Frame with Flush Shutters with Dorset Hardware Fittings (developer specification).
What lifts does JRC Wild Woods Phase 2 have?
Lift System: ELEVATOR: Schindler/Johnson/Kone (developer specification).