MANA SKANDA THE RIGHT LIFE Phase 1 Tower 4, 5 Construction Specifications, Chikkavaderapura
MANA SKANDA THE RIGHT LIFE Phase 1 Tower 4, 5 is an apartment project by Mana Projects in Chikkavaderapura, Varthur - Sarjapur Road, Bengaluru.
Homes cost ₹1.89 Cr at ₹11,128 per sq ft (Mansio price records).
Configurations: 3 BHK and 3.5 BHK; possession Jun 2030; RERA PRM/KA/RERA/1251/308/PR/210725/007939.
Through Mansio, you save ₹2.79 L on a ₹1.89 Cr home in MANA SKANDA THE RIGHT LIFE Phase 1 Tower 4, 5, after our fee.
Key facts
| Fact | Value | Source |
|---|---|---|
| Developer | Mana Projects | Mansio developer records |
| Location | Chikkavaderapura, Varthur - Sarjapur Road, Bengaluru (Anekal taluk) | Mansio location records |
| Type | Apartment | RERA registration |
| Phase | Phase 1: T4, T5 | RERA registration |
| RERA number | PRM/KA/RERA/1251/308/PR/210725/007939 | Karnataka RERA, approved Jul 2025 |
| Stage | Under Construction | RERA registration |
| Possession | Jun 2030 | RERA filing (proposed completion) |
| Price range | ₹1.89 Cr | Mansio price records |
| Price per sq ft (super built-up) | ₹11,128 | Mansio price records |
| Configurations | 3 BHK (1,685 to 1,864 sq ft), 3.5 BHK (2,060 to 2,099 sq ft) | Floor plans on file |
| Towers and units | 2 towers, 592 units | RERA registration |
| Land area | 31.19 acres (98% open area) | RERA registration |
| Density | 18.98 units per acre | Mansio, from RERA land and unit counts |
| Clubhouse size | 3,50,000 sq ft | Mansio project records |
| Water source | BoreWell, Water Tanks | Mansio project records |
| Home loan banks | Punjab National Bank, Canara Bank and Hdfc | Mansio project records |
| Construction start | Jul 2025 | RERA registration |
Construction specifications
- Toilets: Fittings: Grohe/American standard/Roca/Vitra/equivalent make of CP Fittings and accessories of good quality general range; Sanitaryware: Grohe/American standard/Roca/Vitra/equivalent make sanitary fittings of any white shades in colour (developer specification).
- Power Backup: Generator Backup: Generator backup for common area (lifts and other) & complete lighting back up for individual flats. (Kirloskar or equivalent make) (developer specification).
- Doors & Windows: Balcony French Doors: UPVC French door for Balcony with Mosquito mesh; Internal Doors: Salwood door frame and flush door for other doors. SS fittings for other doors; Main Door: Teak wood frame with teak skin main door. SS coated brass fittings for the main door; Ventilators: UPVC ventilators (provision for exhaust fan); Window System: UPVC windows with grills and mosquito mesh (developer specification).
- Electrical: Power Points: T.V. & telephone point in living and master bedroom; Switches: Electrical fittings Anchor - Roma/Schneider-Clipsal; Wiring: Concealed fire resistant copper wiring (Anchor/Havells) (developer specification).
- Flooring: Balcony: Designer ceramic tiles in balconies; Bathrooms: Anti-skid ceramic tiles for bathroom floors. Designer ceramic tiles in toilets; General Flooring: Vitrified tiles in all rooms; Master Bedroom: Laminated wooden flooring for Master Bedroom (developer specification).
- Kitchen: Utility Provisions: Wash provision in utility. Two taps and one aquaguard provision (developer specification).
- Elevators: Lift System: Schindler/Otis/ Kone or equivalent Branded automatic lifts as per Architectural drawings. Elevator with passenger capacity of 10-13 (developer specification).
- Plumbing: Water Supply: Concealed hot and cold CPVC plumbing pipes (developer specification).
- Internal and External Finishes: Doors And Grills Finish: Polished/Enamel painted doors and grills; External Walls: Weather coat painting for exteriors; Internal Walls: Emulsion paint for interiors (developer specification).
- Structure: Design Concept: Open kitchen concept; Structural System: RCC Framed Structure with RCC walls; Walls: Walls 160mm thick (developer specification).
Questions buyers ask about MANA SKANDA THE RIGHT LIFE Phase 1 Tower 4, 5
What is the structure of MANA SKANDA THE RIGHT LIFE Phase 1 Tower 4, 5?
Design Concept: Open kitchen concept; Structural System: RCC Framed Structure with RCC walls; Walls: Walls 160mm thick (developer specification).
What flooring does MANA SKANDA THE RIGHT LIFE Phase 1 Tower 4, 5 use?
Balcony: Designer ceramic tiles in balconies; Bathrooms: Anti-skid ceramic tiles for bathroom floors. Designer ceramic tiles in toilets; General Flooring: Vitrified tiles in all rooms; Master Bedroom: Laminated wooden flooring for Master Bedroom (developer specification).
What doors does MANA SKANDA THE RIGHT LIFE Phase 1 Tower 4, 5 use?
Balcony French Doors: UPVC French door for Balcony with Mosquito mesh; Internal Doors: Salwood door frame and flush door for other doors. SS fittings for other doors; Main Door: Teak wood frame with teak skin main door. SS coated brass fittings for the main door; Ventilators: UPVC ventilators (provision for exhaust fan); Window System: UPVC windows with grills and mosquito mesh (developer specification).