Purva Silversky Construction Specifications, Phase 2
Purva Silversky is an apartment project by Puravankara Limited in Phase 2, Electronic City, Bengaluru.
Homes cost ₹2.57 Cr at ₹13,425 per sq ft (Mansio price records).
Configurations: 3 BHK, 3.5 BHK, 4.5 BHK and 5 BHK; possession Jul 2030; RERA PRM/KA/RERA/1251/310/PR/151225/008338.
Through Mansio, you save ₹4.14 L on a ₹2.57 Cr home in Purva Silversky, after our fee.
Key facts
| Fact | Value | Source |
|---|---|---|
| Developer | Puravankara Limited | Mansio developer records |
| Location | Phase 2, Electronic City, Bengaluru (Bengaluru South taluk) | Mansio location records |
| Type | Apartment | RERA registration |
| RERA number | PRM/KA/RERA/1251/310/PR/151225/008338 | Karnataka RERA, approved Dec 2025 |
| Stage | Under Construction | RERA registration |
| Possession | Jul 2030 | RERA filing (proposed completion) |
| Price range | ₹2.57 Cr | Mansio price records |
| Price per sq ft (super built-up) | ₹13,425 | Mansio price records |
| Configurations | 3 BHK (1,864 to 1,874 sq ft), 3.5 BHK (2,300 to 2,302 sq ft), 4.5 BHK (2,824 to 4,169 sq ft), 5 BHK (4,882 to 5,324 sq ft) | Floor plans on file |
| Towers and units | 3 towers, 356 units | RERA registration |
| Land area | 6.99 acres (63% open area) | RERA registration |
| Density | 50.91 units per acre | Mansio, from RERA land and unit counts |
| Approach road width | 15 m | Mansio project records |
| Water source | Nagarasabha Karyalaya Hebbagodi | Mansio project records |
| Home loan banks | Hdfc, Canara Bank, ICICI Bank, SBI and Kotak Mahindra Bank | Mansio project records |
| Construction start | Jan 2026 | RERA registration |
Construction specifications
- Bathrooms: Dado And Ceiling: All Toilets: Vitrified tiles up to false ceiling as per Architect design. Toilets & Utility: PVC False Ceiling; Maids Bathroom: Maids Toilet: White coloured wall Mounted EWC with seat cover. Wall mounted-White coloured corner washbasin. Fittings: Health Faucet, concealed cistern, angular stop cock, exposed wall mixer with spout and hand shower with holder; Sanitary Ware And Fittings: All other toilets: White coloured wall Mounted EWC with seat cover. White coloured washbasin with composite marble/ full body Vitrified tile for counter and ledge. Fittings: Overhead shower; Health Faucet, concealed cistern, basin mixer, Angular stop cock (developer specification).
- Common Areas: Entrance Lobby: Main Entrance Lobbies & Corridors: Large Format Vitrified tiles. Entrance lobby Walls: Lift architrave: Granite/Vitrified Tile as per Architects design; Lift wall: Vitrified tile; All other walls: Texture paint / Cladding. Ceiling: Gypsum Board false ceil; Staircase: Basement to Main Entrance lobby: Granite slabs. Main Entrance to second floor: Granite slabs. Second floor to terrace: Vitrified tile tread, riser and skirting; Upper Floor Lobby: Typical floor lift lobby & Corridors: Large Format Vitrified Tile. Walls: Lift architrave: Granite / Vitrified tiles; Lift wall: Vitrified tile; All other walls: Acrylic emulsion paint. Ceiling: Gypsum Board false ceiling (developer specification).
- DG Power: Apartment Backup: DG backup for use of lighting, fans, refrigerator, 6A power points in all areas of apartment 3 BHK Apartment - 3000W 3BHK + maid Apartment - 4000W 4 BHK + maid Apartment - 5000W 5 BHK + maid Apartment - 6000W; Common Area Backup: 100% back up for common area Lighting, pumps, Lifts & fire Services Based on Standard Diversity factor (developer specification).
- Doors: Balcony French Doors: Living/Dining, Master Bedroom: 2.5/3.5 track Aluminium frames with Sliding shutters with track and insect mesh; Bathroom Utility Doors: Toilet Doors: FRAME Polished solid wood/prefinished engineered wood frame. SHUTTER- Engineered shutter with laminate/on both sides with required hardware; Internal Doors: Bedroom Doors, Utility to Maid's room: FRAME - Polished solid wood/prefinished engineered wood frame. SHUTTER- Engineered shutter with laminate/on both sides with required hardware; Main Door: Main door: FRAME Polished solid wood/prefinished engineered wood frame with architraves on both sides. SHUTTER Engineered wood shutter with veneer finish/with Digital lock & other required hardware (developer specification).
- Eco-Friendly Features: Energy: Solar water heating for Top two floors Master bedroom toilets, common area lighting requirements partially met through solar power and use of LED lights in common areas; Green Materials: Use of green materials such as low VOC paints and materials with high recycled content; Waste Management: Segregation of waste at source, OWC for processing organic waste and 100% flushing and landscaping water needs met using recycled water; Water Management: Use of efficient water fixtures and collection and reuse of roof rainwater after treatment. STP, WTP & OWC as per design requirements (developer specification).
- Electrical: Geyser Provision: Concealed electrical/plumbing lines with storage type geyser in all toilets & and provision for instant geyser in Kitchen and provision for storage type geyser in Maid's toilet; Power Points: AC provision for VRV or split provided in living/dining & bedrooms; Switches: Modular switches; Wiring: ISI certified cables, FRLS wiring through PVC Conduits concealed in Walls & ceilings (developer specification).
- Fire Safety: Detection And Alarm: Gas leak detector: Provided in kitchen. Smoke detectors: Provided in all habitable spaces and parking levels. Fire Detection and Alarm System: Considered Addressable fire detection and alarm system... Detectors are considered inside the flats... Manual ca; Suppression System: Portable fire extinguishers are considered at strategic locations. Automatic sprinkler system: Sprinklers are considered inside the flats, corridors, lobbies and basement parking areas. Hydrant system: Hydrant system has been considered inside the tower a (developer specification).
- Flooring: Balcony: Balcony: Antiskid Ceramic tiles; Bathrooms: Toilets: Antiskid/Matte Vitrified tiles; Living Dining: Living, Dining, Kitchen, Utility, Foyer, Passage: Large Format Vitrified Tile; Maids Room: Maids Room: Vitrified tiles; Master Bedroom: Master Bedroom: Laminated wooden flooring; Other Bedrooms: Other Bedrooms: Large Format Vitrified Tile flooring (developer specification).
- Hand Railing: Balcony Railing: Balcony: Glass railing with powder coated aluminium channel and SS handrail as per Architect's design intent; Staircase Railing: Staircase: Painted M.S. Railings (developer specification).
- Kitchen: Kitchen Dado: Kitchen: 2 Ft height rough surface-above the level of cooking platform as per Architect design; Provisions: (Dado, sink, faucet, cooking platform / dishwashing platform are not provided to enable the customer to install modular kitchen of their choice). Angular stop cock for Sink mixer and provision for undercounter water purifier (developer specification).
- Lifts: Lift System: Regenerative Type Elevators with AUTOMATIC RESCUE DEVICE (ARD) with emergency call Facility to Security (developer specification).
- Painting: External Walls: Exterior Fascia of building: Texture paint; Internal Ceiling: All Internal Ceilings: Painted in acrylic emulsion; Internal Walls: Internal walls: Gypsum Plaster and painted with acrylic emulsion; Parking Area: Parking Levels: Acrylic paint on walls and Enamel paint up to 1.2m on columns (developer specification).
- Parking: Ev Charging: EV Charging points: Provided for 25% of the number of units (developer specification).
- Security: Home Automation: Standard Home automation features of Video Door Phone, Digital Door lock, Lighting &Fan control, AC Control, Curtain Control, Occupancy sensor, Geyser control, Voice assistant Control through APP and Device; Intercom: Single point intercom provision for each apartment connected to security cabin At Stilt level/Entrance Lobby; Surveillance: CCTV: At campus entry/exit points and along the periphery on the road and pavement (developer specification).
- Structure: Structural System: RCC Structure in Seismic zone 2; Sub Structure: Sub Structure - 1 Basement for parking and services; Super Structure: Super Structure - 32 Residential floors, OHT/service floor and Terrace floor (developer specification).
- Windows: Ventilators: Ventilators: UPVC frame with inbuilt exhaust fan; Window System: Windows: 2.5 track, Glazed Aluminium Sliding/fixed shutters with insect Mesh (developer specification).
Questions buyers ask about Purva Silversky
What is the structure of Purva Silversky?
Structural System: RCC Structure in Seismic zone 2; Sub Structure: Sub Structure - 1 Basement for parking and services; Super Structure: Super Structure - 32 Residential floors, OHT/service floor and Terrace floor (developer specification).
What flooring does Purva Silversky use?
Balcony: Balcony: Antiskid Ceramic tiles; Bathrooms: Toilets: Antiskid/Matte Vitrified tiles; Living Dining: Living, Dining, Kitchen, Utility, Foyer, Passage: Large Format Vitrified Tile; Maids Room: Maids Room: Vitrified tiles; Master Bedroom: Master Bedroom: Laminated wooden flooring; Other Bedrooms: Other Bedrooms: Large Format Vitrified Tile flooring (developer specification).
What doors does Purva Silversky use?
Balcony French Doors: Living/Dining, Master Bedroom: 2.5/3.5 track Aluminium frames with Sliding shutters with track and insect mesh; Bathroom Utility Doors: Toilet Doors: FRAME Polished solid wood/prefinished engineered wood frame. SHUTTER- Engineered shutter with laminate/on both sides with required hardware; Internal Doors: Bedroom Doors, Utility to Maid's room: FRAME - Polished solid wood/prefinished engineered wood frame. SHUTTER- Engineered shutter with laminate/on both sides with required hardware; Main Door: Main door: FRAME Polished solid wood/prefinished engineered wood frame with architraves on both sides. SHUTTER Engineered wood shutter with veneer finish/with Digital lock & other required hardware (developer specification).
What lifts does Purva Silversky have?
Lift System: Regenerative Type Elevators with AUTOMATIC RESCUE DEVICE (ARD) with emergency call Facility to Security (developer specification).
Does Purva Silversky have power backup?
Apartment Backup: DG backup for use of lighting, fans, refrigerator, 6A power points in all areas of apartment 3 BHK Apartment - 3000W 3BHK + maid Apartment - 4000W 4 BHK + maid Apartment - 5000W 5 BHK + maid Apartment - 6000W; Common Area Backup: 100% back up for common area Lighting, pumps, Lifts & fire Services Based on Standard Diversity factor (developer specification).