Key facts
| Fact | Value | Source |
|---|---|---|
| Developer | Sobha Limited | Mansio developer records |
| Location | HSR Layout, Sarjapur Road, Bengaluru (Bengaluru East taluk) | Mansio location records |
| Type | Apartment | RERA registration |
| Phase | Phase 2A | RERA registration |
| RERA number | PRM/KA/RERA/1251/446/PR/030824/006956 | Karnataka RERA, approved Aug 2024 |
| Stage | Under Construction | RERA registration |
| Possession | Jun 2030 | RERA filing (proposed completion) |
| Price range | ₹3.54 Cr | Mansio price records |
| Price per sq ft (super built-up) | ₹20,573 | Mansio price records |
| Configurations | 3 BHK (1,720 to 2,041 sq ft), 4 BHK (2,165 sq ft) | Floor plans on file |
| Towers and units | 1 towers, 46 units | RERA registration |
| Land area | 0.54 acres (53% open area) | RERA registration |
| Density | 85 units per acre | Mansio, from RERA land and unit counts |
| Approach road width | 67 m | Mansio project records |
| Clubhouse size | 20,000 sq ft | Mansio project records |
| Water source | BWSSB | Mansio project records |
| Construction start | Nov 2024 | RERA registration |
Construction specifications
- Bathrooms: Maids Bathroom: Ceramic wall tiling up to ceiling. False ceiling with grid panels; Other Bathrooms: Ceramic wall tiling up to ceiling. False ceiling with grid panels (developer specification).
- Common Areas: Staircase: Concrete treads & Risers; Upper Floor Lobby: Vitrified tile flooring. Textured Paint for Walls. Plastic emulsion paint for ceiling/ False ceiling as per design (developer specification).
- DG Power: Apartment Backup: Standby power of 3kW for 3 BHK & 3BHK+SR,4BHK & 4BHK+SR flat; Common Area Backup: 100% power backup for common area facilities (developer specification).
- Doors: Balcony French Doors: All other external doors to be manufactured in aluminum/ UPVC extruded frames and shutter with panels; Bathroom Utility Doors: Frame – Timber, Architrave - Timber, Shutters-with both side laminate; Internal Doors: Frame – Timber, Architrave - Timber, Shutters-with both side laminate; Main Door: Frame – Timber, Architrave - Timber, Shutters – with both side HDF skin (developer specification).
- Electrical: Power Points: Split AC provision in All Bedrooms and living; Power Supply: BESCOM power supply- 3BHK & 3BHK+SR- 6 kW three phase supply, 4BHK & 4BHK+SR - 8kW Three phase supply (developer specification).
- Flooring: Balcony: Ceramic tile flooring and skirting; Bathrooms: Ceramic tile flooring; Kitchen: Ceramic tile flooring; Living Dining: Vitrified tile flooring and skirting; Maids Room: Ceramic tile flooring and skirting; Other Bedrooms: Vitrified tile flooring and skirting (developer specification).
- Hand Railing: Balcony Railing: Granite coping for parapet/MS handrail as per design; Staircase Railing: MS handrail (developer specification).
- Kitchen: Kitchen Dado: Ceramic wall tiling up to ceiling (developer specification).
- Lifts: Lift System: 2 Nos of lifts in each Wing (developer specification).
- Plumbing: Water Supply: Sanitary fixtures of reputed make in all bathrooms. Chromium plated fittings in all bathrooms (developer specification).
- Painting: External Walls: All walls painted in textured paint; Internal Ceiling: Plastic emulsion paint for walls & ceiling; Internal Walls: Plastic emulsion paint for walls & ceiling (developer specification).
- Parking: Parking System: Covered car parks in basement (developer specification).
- Security: Access Control: Intercom facility from security cabin to each apartment (only point) (developer specification).
- Structure: Structural System: Residential apartments with 2 basements (developer specification).
- Telecom: Provisions: Conduit provision for Data in living & Study Table (developer specification).
- Windows: Window System: Aluminum/UPVC glazed windows (developer specification).
Questions buyers ask about Sobha Infinia Phase 2A Block 5 Wing 5
What is the structure of Sobha Infinia Phase 2A Block 5 Wing 5?
Structural System: Residential apartments with 2 basements (developer specification).
What flooring does Sobha Infinia Phase 2A Block 5 Wing 5 use?
Balcony: Ceramic tile flooring and skirting; Bathrooms: Ceramic tile flooring; Kitchen: Ceramic tile flooring; Living Dining: Vitrified tile flooring and skirting; Maids Room: Ceramic tile flooring and skirting; Other Bedrooms: Vitrified tile flooring and skirting (developer specification).
What doors does Sobha Infinia Phase 2A Block 5 Wing 5 use?
Balcony French Doors: All other external doors to be manufactured in aluminum/ UPVC extruded frames and shutter with panels; Bathroom Utility Doors: Frame – Timber, Architrave - Timber, Shutters-with both side laminate; Internal Doors: Frame – Timber, Architrave - Timber, Shutters-with both side laminate; Main Door: Frame – Timber, Architrave - Timber, Shutters – with both side HDF skin (developer specification).
What lifts does Sobha Infinia Phase 2A Block 5 Wing 5 have?
Lift System: 2 Nos of lifts in each Wing (developer specification).
Does Sobha Infinia Phase 2A Block 5 Wing 5 have power backup?
Apartment Backup: Standby power of 3kW for 3 BHK & 3BHK+SR,4BHK & 4BHK+SR flat; Common Area Backup: 100% power backup for common area facilities (developer specification).