Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2 is an apartment project by Sobha Limited in HSR Layout, Sarjapur Road, Bengaluru.
Homes cost ₹3.82 Cr at ₹20,393 per sq ft (Mansio price records).
Configurations: 3 BHK, 3.5 BHK and 4.5 BHK; possession Dec 2030; RERA PRM/KA/RERA/1251/446/PR/030824/006957.
Through Mansio, you save ₹5.63 L on a ₹3.82 Cr home in Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2, after our fee.
Key facts
| Fact | Value | Source |
|---|---|---|
| Developer | Sobha Limited | Mansio developer records |
| Location | HSR Layout, Sarjapur Road, Bengaluru (Bengaluru East taluk) | Mansio location records |
| Type | Apartment | RERA registration |
| Phase | Phase 2B | RERA registration |
| RERA number | PRM/KA/RERA/1251/446/PR/030824/006957 | Karnataka RERA, approved Aug 2024 |
| Stage | Under Construction | RERA registration |
| Possession | Dec 2030 | RERA filing (proposed completion) |
| Price range | ₹3.82 Cr | Mansio price records |
| Price per sq ft (super built-up) | ₹20,393 | Mansio price records |
| Configurations | 3 BHK (1,871 to 1,900 sq ft), 3.5 BHK (2,009 to 2,257 sq ft), 4.5 BHK (2,264 to 3,176 sq ft) | Floor plans on file |
| Towers and units | 2 towers, 150 units | RERA registration |
| Land area | 2.37 acres (71% open area) | RERA registration |
| Density | 63.38 units per acre | Mansio, from RERA land and unit counts |
| Approach road width | 67 m | Mansio project records |
| Clubhouse size | 20,000 sq ft | Mansio project records |
| Water source | BWSSB | Mansio project records |
| Construction start | Mar 2025 | RERA registration |
Construction specifications
- Bathrooms: Maids Bathroom: False ceiling with grid panels; Other Bathrooms: False ceiling with grid panels (developer specification).
- Common Facilities: Amenities: Swimming pool. Clubhouse. Designer landscaping (developer specification).
- Common Areas: Staircase: Concrete treads & Risers; Upper Floor Lobby: Vitrified tile flooring. Textured Paint for Walls. Plastic emulsion paint for ceiling/ False ceiling as per design (developer specification).
- DG Power: Apartment Backup: Standby power of 3kW for 3 BHK & 3BHK+SR,4BHK & 4BHK+SR flat; Common Area Backup: and 100% power backup for common area facilities (developer specification).
- Doors: Balcony French Doors: All other external doors to be manufactured in aluminum/ UPVC extruded frames and shutter with panels; Internal Doors: Frame - Timber, Architrave - Timber, Shutters-with both side laminate; Main Door: Frame - Timber, Architrave - Timber, Shutters - with both side HDF skin (developer specification).
- Electrical: Power Points: Split AC provision in All Bedrooms and living; Power Supply: BESCOM power supply- 3BHK & 3BHK+SR- 6 kW three phase supply, 4BHK & 4BHK+SR - 8kW Three phase supply (developer specification).
- Flooring: Balcony: Ceramic tile flooring and skirting; Bathrooms: Ceramic tile flooring. Ceramic wall tiling up to ceiling; Foyer Living Dining: Vitrified tile flooring and skirting; Kitchen: Ceramic tile flooring; Maids Room: Ceramic tile flooring and skirting; Other Bedrooms: Vitrified tile flooring and skirting; Utility: Ceramic tile flooring (developer specification).
- Hand Railing: Balcony Railing: Granite coping for parapet/MS handrail as per design; Staircase Railing: MS handrail (developer specification).
- Kitchen: Kitchen Dado: Ceramic wall tiling up to ceiling (developer specification).
- Lifts: Lift System: 2 Nos of lifts in each Wing (developer specification).
- Plumbing: Sanitary Fixtures: Sanitary fixtures of reputed make in all bathrooms; Water Supply: Chromium plated fittings in all bathrooms (developer specification).
- Painting: External Walls: All walls painted in textured paint; Internal Ceiling: Plastic emulsion paint for ceiling; Internal Walls: Plastic emulsion paint for walls & ceiling (developer specification).
- Parking: Parking System: Covered car parks in basement (developer specification).
- Security: Access Control: Intercom facility from security cabin to each apartment (only point) (developer specification).
- Structure: Structural System: Residential apartments with 2 basements (developer specification).
- Telecom: Provisions: Conduit provision for Data in living & Study Table (developer specification).
- Windows: Window System: Aluminum/ UPVC glazed windows (developer specification).
Questions buyers ask about Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2
What is the structure of Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2?
Structural System: Residential apartments with 2 basements (developer specification).
What flooring does Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2 use?
Balcony: Ceramic tile flooring and skirting; Bathrooms: Ceramic tile flooring. Ceramic wall tiling up to ceiling; Foyer Living Dining: Vitrified tile flooring and skirting; Kitchen: Ceramic tile flooring; Maids Room: Ceramic tile flooring and skirting; Other Bedrooms: Vitrified tile flooring and skirting; Utility: Ceramic tile flooring (developer specification).
What doors does Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2 use?
Balcony French Doors: All other external doors to be manufactured in aluminum/ UPVC extruded frames and shutter with panels; Internal Doors: Frame - Timber, Architrave - Timber, Shutters-with both side laminate; Main Door: Frame - Timber, Architrave - Timber, Shutters - with both side HDF skin (developer specification).
What lifts does Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2 have?
Lift System: 2 Nos of lifts in each Wing (developer specification).
Does Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2 have power backup?
Apartment Backup: Standby power of 3kW for 3 BHK & 3BHK+SR,4BHK & 4BHK+SR flat; Common Area Backup: and 100% power backup for common area facilities (developer specification).