Soul of the Seasons - Phase 2 Construction Specifications, Gunjur
Soul of the Seasons - Phase 2 is an apartment project by NBR Group in Gunjur, Bengaluru.
Homes cost ₹1.54 Cr at ₹10,482 per sq ft (Mansio price records).
possession Nov 2029; RERA PRM/KA/RERA/1251/446/PR/260226/008491.
Through Mansio, you save ₹2.07 L on a ₹1.54 Cr home in Soul of the Seasons - Phase 2, after our fee.
Key facts
| Fact | Value | Source |
|---|---|---|
| Developer | NBR Group | Mansio developer records |
| Location | Gunjur, Bengaluru (Bengaluru East taluk) | Mansio location records |
| Type | Apartment | RERA registration |
| RERA number | PRM/KA/RERA/1251/446/PR/260226/008491 | Karnataka RERA, approved Feb 2026 |
| Stage | Under Construction | RERA registration |
| Possession | Nov 2029 | RERA filing (proposed completion) |
| Price range | ₹1.54 Cr | Mansio price records |
| Price per sq ft (super built-up) | ₹10,482 | Mansio price records |
| Towers and units | 2 towers, 312 units | RERA registration |
| Land area | 4.42 acres (90% open area) | RERA registration |
| Density | 70.51 units per acre | Mansio, from RERA land and unit counts |
| Approach road width | 12 m | Mansio project records |
| Water source | BoreWell | Mansio project records |
| Home loan banks | Hdfc, SBI, ICICI Bank and Aditya Birla | Mansio project records |
| Construction start | Feb 2026 | RERA registration |
Construction specifications
- Bathrooms: Master Bathroom: Polished granite slab with Countertop wash basin for all washrooms. Wall mounted W/C with health faucet GROHE/ KOHLER or equivalent in all bathrooms. CP and sanitary fittings will be GROHE / KOHLER or equivalent. Power point provision for Geysers and conc (developer specification).
- DG Power: Apartment Backup: 1 kw power backup for all apartments; Common Area Backup: 100% Generator power backup common area (developer specification).
- Doors: Internal Doors: Laminated doors of 2.2m height with keys, etc; Main Door: Main door will be First quality Teak wood frame with HDF skin molded shutter of 2.35m height having Yale / Hafele smart locks, door viewer, magnetic door catcher etc. Brands – FERRO DOORS /SOBHA/MICASA (developer specification).
- Eco: Water Management: STP – As per consultant. Rain water harvesting (developer specification).
- Electrical: Power Points: Split air conditioner provisions in all bedroom. Provision for Telephone and TV (DTH) points in living and all bedroom. Power Supply: Provided as per BESCOM norms; Switches: Switches and sockets will be ANCHOR / LEGRAND / SCHEINDER / PANASONIC. Modular plate switches, MCB and ELCB system; Wiring: Cables and wiring will be PANASONIC / POLYCAB / RR /HAVELLS standard or equivalent (developer specification).
- Fire Safety: Fire System: External Driveway for fire tender (developer specification).
- Flooring: Bathrooms: The toilet, utility, and balcony will have vitrified tiles. The toilet walls will be finished with vitrified tiles up to a false ceiling; Common Areas: Common areas and staircase will have vitrified tiles/ granite Flooring; Living Dining: Foyer, living, dining, kitchen and all bedrooms will have vitrified tile flooring (developer specification).
- Kitchen: Provisions: Power point Provision for chimney and water purifier. Exhaust provision will be provided (developer specification).
- Lifts: Lift System: Elevator; 10 – Passenger automatic lift SCHNEIDER / TOSHIBA or equivalent will be provided (developer specification).
- Painting: External Walls: Exterior faces of the building will be finished with 1 coat of primer and texture finish; Internal Ceiling: Ceiling will be finished with 1 coat of primer, 2 coats of putty and 2 coats acrylic emulsion. Toilet ceiling will be finished with grid ceiling; Internal Walls: Internal wall in the living, dining, bedrooms, kitchen and Utility will be finished with 1 coat of primer, 2 coats of putty and 2 coats of acrylic emulsion (developer specification).
- Parking: Parking System: Basement Floor Car parking IPS Flooring will be provided (developer specification).
- Security: Surveillance: CCTV surveillance camera pivotal location (developer specification).
- Structure: Structural System: RCC Shear wall structure. Aluminum system formwork with composite concretestructure. Floor to floor height will be maintained at 3000mm (developer specification).
- Windows: Window System: Windows will be UPVC sliding panel with toughend glass. Balconies with UPVC and toughened glass will be provided without grills. For ventilators UPVC frame with suitable louvered glass panels (developer specification).
Questions buyers ask about Soul of the Seasons - Phase 2
What is the structure of Soul of the Seasons - Phase 2?
Structural System: RCC Shear wall structure. Aluminum system formwork with composite concretestructure. Floor to floor height will be maintained at 3000mm (developer specification).
What flooring does Soul of the Seasons - Phase 2 use?
Bathrooms: The toilet, utility, and balcony will have vitrified tiles. The toilet walls will be finished with vitrified tiles up to a false ceiling; Common Areas: Common areas and staircase will have vitrified tiles/ granite Flooring; Living Dining: Foyer, living, dining, kitchen and all bedrooms will have vitrified tile flooring (developer specification).
What doors does Soul of the Seasons - Phase 2 use?
Internal Doors: Laminated doors of 2.2m height with keys, etc; Main Door: Main door will be First quality Teak wood frame with HDF skin molded shutter of 2.35m height having Yale / Hafele smart locks, door viewer, magnetic door catcher etc. Brands – FERRO DOORS /SOBHA/MICASA (developer specification).
What lifts does Soul of the Seasons - Phase 2 have?
Lift System: Elevator; 10 – Passenger automatic lift SCHNEIDER / TOSHIBA or equivalent will be provided (developer specification).
Does Soul of the Seasons - Phase 2 have power backup?
Apartment Backup: 1 kw power backup for all apartments; Common Area Backup: 100% Generator power backup common area (developer specification).