MANA SKANDA THE RIGHT LIFE Phase 2 Tower 3, 4, 5, 6 Construction Specifications, Chikkavaderapura
MANA SKANDA THE RIGHT LIFE Phase 2 Tower 3, 4, 5, 6 is an apartment project by Mana Projects in Chikkavaderapura, Varthur - Sarjapur Road, Bengaluru.
Configurations: 2.5 BHK, 3 BHK, 3.5 BHK, 4 BHK and 4.5 BHK; possession Jun 2031; RERA PRM/KA/RERA/1251/308/PR/120326/008522.
Key facts
| Fact | Value | Source |
|---|---|---|
| Developer | Mana Projects | Mansio developer records |
| Location | Chikkavaderapura, Varthur - Sarjapur Road, Bengaluru (Anekal taluk) | Mansio location records |
| Type | Apartment | RERA registration |
| Phase | Phase 2 - T3, T4, T5, T6 | RERA registration |
| RERA number | PRM/KA/RERA/1251/308/PR/120326/008522 | Karnataka RERA, approved Mar 2026 |
| Stage | Just launched | RERA registration |
| Possession | Jun 2031 | RERA filing (proposed completion) |
| Configurations | 2.5 BHK (1,805 to 1,940 sq ft), 3 BHK (1,783 to 2,264 sq ft), 3.5 BHK (2,221 to 2,368 sq ft), 4 BHK (2,615 to 2,699 sq ft), 4.5 BHK (2,791 to 2,857 sq ft) | Floor plans on file |
| Towers and units | 4 towers, 526 units | RERA registration |
| Land area | 5.57 acres (85% open area) | RERA registration |
| Density | 94.51 units per acre | Mansio, from RERA land and unit counts |
| Clubhouse size | 46,000 sq ft | Mansio project records |
| Water source | BoreWell, BWSSB, borewell | Mansio project records |
| Home loan banks | Hdfc, Punjab National Bank and Canara Bank | Mansio project records |
| Construction start | Nov 2026 | RERA registration |
Construction specifications
- Toilets: Other Bathrooms: Grohe/American standard/Roca/Vitra/equivalent make of CP Fittings and accessories of good quality general range. Grohe/American standard/Roca/Vitra/equivalent make sanitary fittings of any white shades in colour; Water Supply: Concealed hot and cold CPVC plumbing pipes (developer specification).
- Power Backup: Apartment Backup: complete lighting back up for individual flats; Common Area Backup: Generator backup for common area (lifts and other) (Kirloskar or equivalent make) (developer specification).
- Doors & Windows: Balcony French Doors: UPVC French door for Balcony with Mosquito mesh; Internal Doors: Salwood door frame and flush door for other doors. SS fittings for other doors; Main Door: Teak wood frame with teak skin main door. SS coated brass fittings for the main door; Window System: UPVC windows with grills and mosquito mesh. UPVC ventilators (provision for exhaust fan) (developer specification).
- Electrical: Power Points: T.V. & telephone point in living and master bedroom; Switches: Electrical fittings Anchor - Roma/Schneider-Clipsal; Wiring: Concealed fire resistant copper wiring (Anchor/Havells) (developer specification).
- Flooring: Balcony: Designer ceramic tiles in balconies; Bathrooms: Anti-skid ceramic tiles for bathroom floors. Designer ceramic tiles in toilets; Living Dining: Vitrified tiles in all rooms; Master Bedroom: Laminated wooden flooring for Master Bedroom (developer specification).
- Elevators: Lift System: Schindler/Otis/Kone or equivalent Branded automatic lifts as per Architectural drawings. Elevator with passenger capacity of 10-13 (developer specification).
- Internal and External Finishes: Doors And Grills: Polished/Enamel painted doors and grills; External Walls: Weather coat painting for exteriors; Internal Walls: Emulsion paint for interiors (developer specification).
- Structure: Internal Walls: Walls 160mm thick; Structural System: RCC Framed Structure with RCC walls (developer specification).
Questions buyers ask about MANA SKANDA THE RIGHT LIFE Phase 2 Tower 3, 4, 5, 6
What is the structure of MANA SKANDA THE RIGHT LIFE Phase 2 Tower 3, 4, 5, 6?
Internal Walls: Walls 160mm thick; Structural System: RCC Framed Structure with RCC walls (developer specification).
What flooring does MANA SKANDA THE RIGHT LIFE Phase 2 Tower 3, 4, 5, 6 use?
Balcony: Designer ceramic tiles in balconies; Bathrooms: Anti-skid ceramic tiles for bathroom floors. Designer ceramic tiles in toilets; Living Dining: Vitrified tiles in all rooms; Master Bedroom: Laminated wooden flooring for Master Bedroom (developer specification).
What doors does MANA SKANDA THE RIGHT LIFE Phase 2 Tower 3, 4, 5, 6 use?
Balcony French Doors: UPVC French door for Balcony with Mosquito mesh; Internal Doors: Salwood door frame and flush door for other doors. SS fittings for other doors; Main Door: Teak wood frame with teak skin main door. SS coated brass fittings for the main door; Window System: UPVC windows with grills and mosquito mesh. UPVC ventilators (provision for exhaust fan) (developer specification).