MANA SKANDA THE RIGHT LIFE Phase 1 Tower 7, 8, 9 Construction Specifications, Chikkavaderapura
MANA SKANDA THE RIGHT LIFE Phase 1 Tower 7, 8, 9 is an apartment project by Mana Projects in Chikkavaderapura, Varthur - Sarjapur Road, Bengaluru.
Homes cost ₹1.40 Cr at ₹11,090 per sq ft (Mansio price records).
Configurations: 2 BHK and 3 BHK; possession Dec 2029; RERA PRM/KA/RERA/1251/308/PR/210325/007611.
Through Mansio, you save ₹1.80 L on a ₹1.40 Cr home in MANA SKANDA THE RIGHT LIFE Phase 1 Tower 7, 8, 9, after our fee.
Key facts
| Fact | Value | Source |
|---|---|---|
| Developer | Mana Projects | Mansio developer records |
| Location | Chikkavaderapura, Varthur - Sarjapur Road, Bengaluru (Anekal taluk) | Mansio location records |
| Type | Apartment | RERA registration |
| Phase | Phase 1 - T7, T8, T9 | RERA registration |
| RERA number | PRM/KA/RERA/1251/308/PR/210325/007611 | Karnataka RERA, approved Mar 2025 |
| Stage | Under Construction | RERA registration |
| Possession | Dec 2029 | RERA filing (proposed completion) |
| Price range | ₹1.40 Cr | Mansio price records |
| Price per sq ft (super built-up) | ₹11,090 | Mansio price records |
| Configurations | 2 BHK (1,249 to 1,381 sq ft), 3 BHK (1,539 to 1,868 sq ft) | Floor plans on file |
| Towers and units | 3 towers, 825 units | RERA registration |
| Land area | 31.19 acres (97% open area) | RERA registration |
| Density | 26.45 units per acre | Mansio, from RERA land and unit counts |
| Clubhouse size | 3,50,000 sq ft | Mansio project records |
| Water source | BoreWell, WATER TANKERS | Mansio project records |
| Home loan banks | Hdfc, Punjab National Bank and Canara Bank | Mansio project records |
| Construction start | Mar 2025 | RERA registration |
Construction specifications
- Toilets: Other Bathrooms: Grohe/American standard/Roca/Vitra/equivalent make of CP Fittings and accessories of good quality general range. Grohe/American standard/Roca/Vitra/equivalent make sanitary fittings of any white shades in colour (developer specification).
- Power Backup: Apartment Backup: complete lighting back up for individual flats. (Kirloskar or equivalent make); Common Area Backup: Generator backup for common area (lifts and other). (Kirloskar or equivalent make) (developer specification).
- Doors & Windows: Balcony French Doors: UPVC French door for Balcony with Mosquito mesh; Internal Doors: Salwood door frame and flush door for other doors. SS fittings for other doors; Main Door: Teak wood frame with teak skin main door. SS coated brass fittings for the main door; Window System: UPVC windows with grills and mosquito mesh. UPVC ventilators (provision for exhaust fan) (developer specification).
- Electrical: Power Points: T.V. & telephone point in living and master bedroom; Switches: Electrical fittings Anchor - Roma/Schneider-Clipsal; Wiring: Concealed fire resistant copper wiring (Anchor/Havells) (developer specification).
- Flooring: Balcony: Designer ceramic tiles in balconies; Bathrooms: Anti-skid ceramic tiles for bathroom floors. Designer ceramic tiles in toilets; Kitchen: Vitrified tiles in all rooms; Living Dining: Vitrified tiles in all rooms; Master Bedroom: Laminated wooden flooring for Master Bedroom; Other Bedrooms: Vitrified tiles in all rooms (developer specification).
- Kitchen: Provisions: Wash provision in utility. Two taps and one aquaguard provision (developer specification).
- Elevators: Lift System: Schindler/Otis/ Kone or equivalent Branded automatic lifts as per Architectural drawings. Elevator with passenger capacity of 10-13 (developer specification).
- Plumbing: Water Supply: Concealed hot and cold CPVC plumbing pipes (developer specification).
- Internal and External Finishes: External Walls: Weather coat painting for exteriors; Internal Walls: Emulsion paint for interiors; Railings: Polished/Enamel painted doors and grills (developer specification).
- Structure: Internal Walls: Walls 160mm thick; Structural System: RCC Framed Structure with RCC walls (developer specification).
Questions buyers ask about MANA SKANDA THE RIGHT LIFE Phase 1 Tower 7, 8, 9
What is the structure of MANA SKANDA THE RIGHT LIFE Phase 1 Tower 7, 8, 9?
Internal Walls: Walls 160mm thick; Structural System: RCC Framed Structure with RCC walls (developer specification).
What flooring does MANA SKANDA THE RIGHT LIFE Phase 1 Tower 7, 8, 9 use?
Balcony: Designer ceramic tiles in balconies; Bathrooms: Anti-skid ceramic tiles for bathroom floors. Designer ceramic tiles in toilets; Kitchen: Vitrified tiles in all rooms; Living Dining: Vitrified tiles in all rooms; Master Bedroom: Laminated wooden flooring for Master Bedroom; Other Bedrooms: Vitrified tiles in all rooms (developer specification).
What doors does MANA SKANDA THE RIGHT LIFE Phase 1 Tower 7, 8, 9 use?
Balcony French Doors: UPVC French door for Balcony with Mosquito mesh; Internal Doors: Salwood door frame and flush door for other doors. SS fittings for other doors; Main Door: Teak wood frame with teak skin main door. SS coated brass fittings for the main door; Window System: UPVC windows with grills and mosquito mesh. UPVC ventilators (provision for exhaust fan) (developer specification).