Sobha Neopolis Phase 4 - 3, 4, 8 & 9 Construction Specifications, Panathur
Sobha Neopolis Phase 4 - 3, 4, 8 & 9 is an apartment project by Sobha Limited in Panathur, Bengaluru.
Homes cost ₹2.20 Cr at ₹13,666 per sq ft (Mansio price records).
Configurations: 3 BHK; possession Dec 2031; RERA PRM/KA/RERA/1251/446/PR/220923/006283.
Through Mansio, you save ₹3.40 L on a ₹2.20 Cr home in Sobha Neopolis Phase 4 - 3, 4, 8 & 9, after our fee.
Key facts
| Fact | Value | Source |
|---|---|---|
| Developer | Sobha Limited | Mansio developer records |
| Location | Panathur, Bengaluru (Bengaluru East taluk) | Mansio location records |
| Type | Apartment | RERA registration |
| Phase | Phase 4 - W3, W4, W8 & W9 | RERA registration |
| RERA number | PRM/KA/RERA/1251/446/PR/220923/006283 | Karnataka RERA, approved Sep 2023 |
| Stage | Under Construction | RERA registration |
| Possession | Dec 2031 | RERA filing (proposed completion) |
| Price range | ₹2.20 Cr | Mansio price records |
| Price per sq ft (super built-up) | ₹13,666 | Mansio price records |
| Configurations | 3 BHK (1,611 sq ft) | Floor plans on file |
| Towers and units | 4 towers, 376 units | RERA registration |
| Land area | 5.01 acres (82% open area) | RERA registration |
| Density | 75 units per acre | Mansio, from RERA land and unit counts |
| Approach road width | 30 m | Mansio project records |
| Clubhouse size | 77,850 sq ft | Mansio project records |
| Water source | Tankers | Mansio project records |
| Construction start | Apr 2024 | RERA registration |
Construction specifications
- Bathrooms: Other Bathrooms: False ceiling with grid panels Sanitary fixtures of reputed make in all bathrooms Chromium plated fittings in all bathrooms (developer specification).
- Common Areas: Staircase: Concrete treads & Risers Textured Paint for Walls Plastic emulsion paint for ceiling; Upper Floor Lobby: Vitrified tile flooring Textured Paint for Walls Plastic emulsion paint for ceiling/ False ceiling as per design Granite coping for parapet/MS handrail (developer specification).
- DG Power: Apartment Backup: Standby power of 1kW for 3 BHK, 3BHK+Study & 4 BHK Flats flat; Common Area Backup: 100% power backup for common area facilities (developer specification).
- Doors: Balcony French Doors: All other external doors to be manufactured in aluminum/ UPVC extruded frames and shutter with panels; Bathroom Utility Doors: Frame – Timber Architrave – Timber Shutters-with both side laminate; Internal Doors: Frame – Timber Architrave – Timber Shutters-with both side laminate; Main Door: Frame – Timber Architrave – Timber Shutters – with both side HDF skin (developer specification).
- Electrical: Power Points: Split AC provision in All Bedrooms and living; Power Supply: BESCOM power supply: 3BHK: 4 kW three phase supply 3BHK+Study: 5 KW three phase supply 4BHK: 6kW Three phase supply (developer specification).
- Flooring: Balcony: Ceramic tile flooring and skirting; Bathrooms: Ceramic tile flooring. Ceramic wall tiling up to ceiling; Foyer Corridor: Vitrified tile flooring and skirting; Kitchen: Ceramic tile flooring; Other Bedrooms: Vitrified tile flooring and skirting (developer specification).
- Hand Railing: Balcony Railing: Granite coping for parapet/MS handrail as per design; Staircase Railing: MS handrail (developer specification).
- Kitchen: Kitchen Dado: Ceramic wall tiling up to ceiling (developer specification).
- Lifts: Lift System: 2 Nos of lifts in each Wing (developer specification).
- Plumbing: Water Supply: Sanitary fixtures of reputed make in all bathrooms Chromium plated fittings in all bathrooms (developer specification).
- Painting: External Walls: All walls painted in textured paint; Internal Ceiling: Plastic emulsion paint for walls & ceiling; Internal Walls: Plastic emulsion paint for walls & ceiling (developer specification).
- Parking: Parking System: Covered car parks in basement (developer specification).
- Security: Access Control: Intercom facility provision from security cabin to each apartment (developer specification).
- Structure: Structural System: 2 Basements + Ground + 18 storied RCC structure (developer specification).
- Telecom: Provisions: Television points in living & one bedroom. Data points in living & one bedroom (developer specification).
- Windows: Window System: Aluminum glazed windows (developer specification).
Questions buyers ask about Sobha Neopolis Phase 4 - 3, 4, 8 & 9
What is the structure of Sobha Neopolis Phase 4 - 3, 4, 8 & 9?
Structural System: 2 Basements + Ground + 18 storied RCC structure (developer specification).
What flooring does Sobha Neopolis Phase 4 - 3, 4, 8 & 9 use?
Balcony: Ceramic tile flooring and skirting; Bathrooms: Ceramic tile flooring. Ceramic wall tiling up to ceiling; Foyer Corridor: Vitrified tile flooring and skirting; Kitchen: Ceramic tile flooring; Other Bedrooms: Vitrified tile flooring and skirting (developer specification).
What doors does Sobha Neopolis Phase 4 - 3, 4, 8 & 9 use?
Balcony French Doors: All other external doors to be manufactured in aluminum/ UPVC extruded frames and shutter with panels; Bathroom Utility Doors: Frame – Timber Architrave – Timber Shutters-with both side laminate; Internal Doors: Frame – Timber Architrave – Timber Shutters-with both side laminate; Main Door: Frame – Timber Architrave – Timber Shutters – with both side HDF skin (developer specification).
What lifts does Sobha Neopolis Phase 4 - 3, 4, 8 & 9 have?
Lift System: 2 Nos of lifts in each Wing (developer specification).
Does Sobha Neopolis Phase 4 - 3, 4, 8 & 9 have power backup?
Apartment Backup: Standby power of 1kW for 3 BHK, 3BHK+Study & 4 BHK Flats flat; Common Area Backup: 100% power backup for common area facilities (developer specification).